EasyManua.ls Logo

FISCHER DELTASCOPE DMP30 - Batch Management

FISCHER DELTASCOPE DMP30
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
Settings for measurement DMP30 / DMP40
Creating a new batch by copying
You use the Copy function to create a batch by copying a selected batch. Apart from
the measured readings and the batch name, the batch copy contains all the settings
of the batch copy template.
> Batches > OK >select a batch as a copy template from the list> OK > Copy
> OK > The Measurement view of the newly created batch appears in the display
Measurement settings, see from page 38
Assign calibration, see page 44
Check calibration, see page 68
Rename a batch, see page 88
7.2 Opening a batch
> Batches > OK > select desired batch from the batch list > OK
The Measurement view of the selected batch appears in the display.
Measure, see from page 46
Check calibration, see page 68
7.3 Activating/deactivating specification limit monitoring
Before you start
The batch for which you want to make the changes is open in the gauge.
To activate specification limit monitoring and set the specification
limits
1. Select the specification limits to be monitored: > Batch Modify > OK > Limits
> OK > select desired specification limit parameter > OK.
Parameter is activated:
The selected specification limit(s) with the currently set values appear in the
specification limit menu.
[ ]
[ ]
[ ]

Table of Contents

Related product manuals