Preventative maintenance schedule for CF900
hopper
Preventative maintenance schedule for the Paser CF900 Abrasive Delivery System.
What do I do? When do I do
it?
Examine the pressure regulating valves and solenoid valves for damage. Daily
Examine the solenoid valve on the pinch valve for damage. Daily
Examine the pressure gauges for functionality. Daily
Ensure the pressure difference between PR1 and PR2 is at least 3.45 bar (50
psi).
Daily
Replace the PV1 pinch valve seal.
Every 6000
cycles
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: PASER CF900 Abrasive Delivery System