EasyManua.ls Logo

Flow MACH 300 - Preventative maintenance schedule for CF900 hopper

Flow MACH 300
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventative maintenance schedule for CF900
hopper
Preventative maintenance schedule for the Paser CF900 Abrasive Delivery System.
What do I do? When do I do
it?
Examine the pressure regulating valves and solenoid valves for damage. Daily
Examine the solenoid valve on the pinch valve for damage. Daily
Examine the pressure gauges for functionality. Daily
Ensure the pressure difference between PR1 and PR2 is at least 3.45 bar (50
psi).
Daily
Replace the PV1 pinch valve seal.
Every 6000
cycles
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: PASER CF900 Abrasive Delivery System

Table of Contents

Related product manuals