EasyManua.ls Logo

Flow MACH 300 - Transporting the CF900 hopper

Flow MACH 300
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transporting the CF900 hopper
To transport the hopper
Before you transport the hopper, make sure you do the following:
1. If you plan to connect the hopper to a different voltage power supply in the new location,
please contact Flow Service.
2. Remove abrasive from the silo.
WARNING! If you leave abrasive in the silo, it could cause an unsafe high center of
gravity during transport.
3. Lift the hopper with a forklift or pallet jack. Place the forks under a pair of lower beams on the
frame (accessible from all four sides).
WARNING! Load and unload all equipment with a properly rated forklift or pallet jack in
accordance with local regulations. We recommend that you have flaggers and spotters present
while you load or unload equipment.
4. Secure the load so that it does not move during transport.
To set up the hopper after transport
To set up the hopper after transport, do the following:
Put the equipment in position, and then level the hopper using the level pads. If required, use
anchor bolts to attach it to the floor.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 12, 2021 PST
Safety

Table of Contents

Related product manuals