EasyManua.ls Logo

Flow MACH 300 - Replace the PV1 pinch valve seal

Flow MACH 300
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Replace the PV1 pinch valve seal
Recommended maintenance interval
Replace the PV1 pinch valve seal after approximately 6000 switching cycles.
Parts
Pinch valve seal (hose insert) …………… A-31850-1
Tools
Adjustable wrenches: 6 in. & 12 in.
Supplies
Clean, lint-free rag
Wooden blocking
Notes
= Assistant required for this step.
Safety precaution
The vessel could weigh up to 91 kg (200 lb) when full. Support the vessel if it is not empty.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: PASER CF900 Abrasive Delivery System

Table of Contents

Related product manuals