EasyManua.ls Logo

Flow MACH 300 - Troubleshoot the CF900 hopper by symptom; No abrasive delivery even though there is enough abrasive in the ADS for operation; No abrasive delivery, and the yellow warning indicator and;or the audible signal is not on; The abrasive metering valve runs dry between fill cycles

Flow MACH 300
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Troubleshoot the CF900 hopper by symptom
KEY
PR1 = Pinch valve pressure (Pinch valve)
PR2 = Conveying pressure (Vessel)
No abrasive delivery even though there is enough abrasive in the ADS for operation
PR2 may be set too low. Increase the pressure to PR2, but maintain at least a 3.45 bar (50 psi)
difference between PR1 and PR2.
Air and electrical supply connections may be interrupted. Inspect all air and electrical supply
connections.
The silo or vessel low-abrasive switch is malfunctioning. Test the function of the switches. If they
do not function correctly, call Flow Service.
No abrasive delivery, and the yellow warning indicator and/or the audible signal is not
on
The bulb to the yellow warning indicator may have burned out. Test the function of the indicator,
and then replace the bulb if needed.
Test the function of the audible signal, and then replace it if needed.
If the container is empty and the indicator and audible signal are not on, call Flow Service.
The abrasive metering valve runs dry between fill cycles
PR2 may be set too low. Increase the pressure to PR2, but maintain at least a 3.45 bar (50 psi)
difference between PR1 and PR2.
Flowrate demand from metering valve exceeds 1.2 lb/min. Order a high flowrate kit for the valve.
Call Flow Service for more information.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 14, 2021 PST
Ancillary option: PASER CF900 Abrasive Delivery System

Table of Contents

Related product manuals