EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - Page 191

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 3
Small Configuration
Installing Power, Ground, and Alarm Cables
3-95
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
3.16.2 Installing Power, Ground, and Alarm Cables
SUBTASK PAGE
This subprocedure includes the following subtasks: Procedure
Identify Cabling Schematic. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96
Disconnect Power from CBP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96
Install Shelf Power Harnesses CB1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96
Install Shelf Power Harnesses CB2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-98
Install Shelf Power Harnesses CB3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-99
Install Frame Ground Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-101
Install Rack Alarm Cable Harness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-101
Install Shelf Alarm Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-102
Final Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-102
Use this procedure to install power, ground, and alarm cabling for a rack of FLASHWAVE
7500 Small Configuration equipment.
DANGER:
Use properly insulated tools and do not allow tools, cables, or other metal objects to
connect across terminals. At this point, –48 V DC power has been applied to the CBP, and
improper handling may result in personal injury, damage to equipment, or both. Fujitsu
recommends that office power be removed from the rack using local procedures.
Note: Ensure that all cables installed in this procedure are properly bundled, laced, and secured
to the rack in accordance with local procedures. Connectors should be secured in place using
connector retaining screws.
Revision 1, June 2009

Table of Contents

Related product manuals