CHAPTER 2
Core Configuration
Installing Optical/Tributary Shelf, LAS, and Heat Baffle
2-25
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
2.8 Installing Optical/Tributary Shelf, LAS, and Heat Baffle
This procedure provides instructions for installing a generic shelf and heat baffle, if required,
into a relay rack. A rack or other suitable mounting structure must already be installed in
accordance with local plans and procedures. See Figure 2-13 [p. 2-25], Figure 2-14 [p. 2-26],
and Figure 2-15 [p. 2-27] for front views of the Optical shelf, the Tributary shelf, and the
lambda access shelf (LAS1) respectively. These three shelves are mounted using the generic
shelf procedures.
Figure 2-13: Optical Shelf—Populated with Plug-In Units (Front View)
(Core Configuration)
r0923_2