EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - 2.10 Installing Power, Ground, and Alarm Cables; 4.11 Installing the ETSI LAM;DCM Shelf (SDL1)

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2
Core Configuration
Installing the Circuit Breaker Panel
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
2-20
Fujitsu and Fujitsu Customer Use Only
2.6 Installing the Circuit Breaker Panel
The circuit breaker panel (CBP) (see Figure 2-11 [p. 2-20]) should be the first item installed
in the rack. For procedures to install the CBP, refer to Circuit Breaker Panel. After the CBP is
installed at the top of the rack, the other equipment can be installed.
Note: The CBP may not have circuit breakers CB1 through CB4 installed. Locate the
HA15B-0001-C365 circuit breaker kit, if required, for labels and circuit breaker units.
Figure 2-11: Circuit Breaker Panel, HA15B-001-B361
Revision 1, June 2009

Table of Contents

Related product manuals