CHAPTER 4
ETSI Configuration
Connecting and Checking Office Battery to the PDP
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-20
Fujitsu and Fujitsu Customer Use Only
4.7 Connecting and Checking Office Battery to the PDP
This section includes the following subsections: Section
4.7.1 Connecting Office Battery to PDP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21
4.7.2 Checking Battery Voltage at PDP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-24
If not done previously as part of an earlier FLASHWAVE 7500 installation, the office-battery
power cables must be connected to the PDP power input connectors. However, the
office-battery ends of the power cables must not be connected to the primary power source
until the PDP is completely installed.
Note: In this section, the term battery refers to the office DC power feed for the bay in which
the equipment is being mounted.
The PDP supports four separate battery/return power sources:
■
A1 Input
■
A2 Input
■
B1 Input
■
B2 Input
Each power input connection consists of a pair of 2-hole compression lugs (0.25 inch holes on
0.625 inch centers).
An additional connector is provided for chassis ground.
For additional details on the PDP, refer to ADC # PWX-1LFA2DF documentation supplied
by the vendor.
The following tools are required:
■
No. 1 Phillips screwdriver
■
7/16 inch socket wrench