CHAPTER 4
ETSI Configuration
Storing, Unpacking, and Inspecting Equipment
4-13
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
15 Do the serial numbers on the equipment and the shipping documents match?
If YES:
Go to Step 17 [p. 4-13].
If NO:
Continue with Step 16 [p. 4-13].
16 Notify the transportation company if the equipment was damaged or if an improper shipment
was received. DO NOT continue the installation of the equipment until the problem has
been corrected. After the problem is resolved, repeat this procedure beginning with Step 2
[p. 4-11].
17 Update office records according to local procedures.
18 Do you want to install the equipment rack now?
If YES:
Proceed to Section 4.5, Installing the Rack [p. 4-15].
If NO:
This procedure is complete.
4.4.3 Unpacking and Inspecting Equipment
This procedure provides guidelines for unpacking system equipment and ensuring the safe
arrival of all equipment. Fujitsu recommends that the installation team familiarize themselves
with the specific area where the installation is to be performed, examine the racks to be used,
and ensure that sufficient workspace to unpack the equipment is available.
Do not attempt to handle and install the shelves without sufficient assistance. The
Optical/Tributary shelf weighs approximately 48.5 lb (22 kg) empty (without fans).
Equipped, the Optical/Tributary shelf weighs significantly more. Handling the equipment
without sufficient assistance may result in personal injury, damage to the equipment, or
both.