CHAPTER 2
Core Configuration
Rack Configurations
2-3
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
2.3 Rack Configurations
The FLASHWAVE 7500 Core Configuration system racks can be configured in several
variations. Fujitsu recommends ordering the top-level part number of a particular rack, which
includes the rack, the appropriate shelves, the rack wiring and cabling, and other
miscellaneous devices and equipment as required. The system racks are installed on-site in
accordance with local plans and procedures.
Another option is to order racks populated with a minimum of shelves and then add to the
complement as required (the racks are wired for a full complement of shelves). In addition,
the FLASHWAVE 7500 Core Configuration system equipment, minus the rack, can be
ordered and installed in customer-supplied racks.
Note: Due to NEBS™ Earthquake-resistance requirements, the LAS shelf should always be
installed at the top of the rack in any configuration.
Figures 2-1 [p. 2-4] through 2-7 [p. 2-10] show the standard rack configurations for a
FLASHWAVE 7500 Core Configuration NE. For detailed procurement information, refer to
Ordering Information, or contact your Fujitsu sales representative.