CHAPTER 2
Core Configuration
Rack Configurations
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
2-4
Fujitsu and Fujitsu Customer Use Only
Figure 2-1: Rack Configuration with One Universal Shelf and One DCM Shelf
(PCD1B110-0928-A001) (Core Configuration)
7-ft 23-in. Rack
PCD1B110-0928-A001
SHU3 Shelf
HSW2 Heat Baffle
Circuit Breaker Panel
DCM Shelf
m1718fr_1
Revision 1, June 2009