EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - 5.11 Checking Power at Extension Shelf

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 2
Core Configuration
Installing Optical/Tributary Shelf, LAS, and Heat Baffle
2-27
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
The Fujitsu part number for the 23-inch Optical/Tributary shelf is FC9682SHU3, the
23-inch LAS is FC9682LAS1, and the 23-inch heat baffle is FC9682HSW2.
The heat baffle is mounted in a specific location as shown in the rack configurations in
Figures 2-1 [p. 2-4] through 2-7 [p. 2-10]. Review these figures to determine when, as the
shelves are installed, the heat baffle should be added. Installation is minimal.
Do not install the Optical/Tributary shelf directly above any air-blocking product. LAS
shelves and DCM shelves are examples of air-blocking products. Leave at least 1U (1.75
inches) of air clearance space between the shelf and any air-blocking product installed beneath
the Optical/Tributary shelf.
The Optical/Tributary shelf can be installed at the bottom of the rack if adequate air clearance
is present between the bottom of the shelf and the floor. If air clearance between the bottom
of the shelf and the floor is not adequate, mount the Optical/Tributary shelf near the bottom
of the rack leaving 1U (1.75 inches) of air clearance space below it.
Figure 2-15: LAS1—Populated with LAMs (Front View)
(Core Configuration)
Cable Tray
IPMA-LAM5
Note: IPMA-LAM5 shown in each slot.
m1656vl_2
Revision 1, June 2009

Table of Contents

Related product manuals