8 On the backplane of the shelf identified in Step 5 [p. 3-96], remove the plastic cover on the
shelf power terminal strip located on the bottom right of the shelf backplane (see Figure 3-77
[p. 3-92]).
9 Connect both ends of cable GA of the power harness as follows:
a. Identify lug GA in the power harness (see Figure 3-71 [p. 3-86]) and connect it to shelf
terminal GA (see Figure 3-77 [p. 3-92]).
b. Connect the other end of the same cable to CBP terminal RTN A1 CB1 (see
Figure 3-75 [p. 3-90]).
10 Connect both ends of cable GB of the power harness as follows:
a. Identify lug GB in the power harness (see Figure 3-71 [p. 3-86]) and connect it to shelf
terminal GB (see Figure 3-77 [p. 3-92]).
b. Connect the other end of the same cable to CBP terminal RTN B1 CB1 (see
Figure 3-75 [p. 3-90]).
11 Connect both ends of cable MA of the power harness as follows:
a. Identify lug MA in the power harness (see Figure 3-71 [p. 3-86]) and connect it to shelf
terminal MAIN A (see Figure 3-77 [p. 3-92]).
b. Connect the other end of the same cable to CBP terminal BATT A1 CB1 (see
Figure 3-75 [p. 3-90]).
12 Connect both ends of cable MB of the power harness as follows:
a. Identify lug MB in the power harness (Figure 3-71 [p. 3-86]) and connect it to shelf
terminal MAIN B (see Figure 3-77 [p. 3-92]).
b. Connect the other end of the same cable to CBP terminal BATT B1 CB1 (see
Figure 3-75 [p. 3-90]).
13 Connect both ends of cable FGND of the power harness as follows:
a. Identify lug FGND in the power harness (see Figure 3-71 [p. 3-86]) and connect it to
shelf terminal FG (see Figure 3-77 [p. 3-92]).
b. Connect the other end of the same cable to the equipment rack frame ground.
14 Replace the plastic cover over the shelf backplane terminal strip.