DescriptionPart
Waste tubing from the Injection valve, the pH valve and the Outlet valve
(W, W1, W2 and W3).
1
Waste tubing from the Fraction collector and the Buffer tray.2
Instructions
The following steps describe how to prepare the waste tubing.
ActionStep
Place the four pieces of waste tubing from the Injection valve, the pH valve
and the Outlet valve (W, W1, W2 and W3) in a vessel placed below the bench.
1
NOTICE
The maximum level of the waste vessel for the waste
tubing from the valves must be lower than 30 cm
above the lab bench.
Place the three pieces of waste tubing from the Fraction collector and the
Buffer tray in a waste vessel placed below the bench.
2
NOTICE
The maximum level of the waste vessel for the waste
tubing from the Fraction collector and the Buffer tray
must be lower than the bench height.
160 ÄKTA avant User Manual 29035184 AE
5 Operation
5.2 Prepare the flow path