ActionStep
Place the protective cover around the flow cell to protect the electronics in-
side the optical unit from liquid spillage.
5
Note:
The protective cover should be assembled after completing the assembly of
the UV flow cell inside the UV Monitor by just press-fit.
In the Settings and Service screen, tap UV. In the UV screen, perform a UV
LED calibration and a Flow cell path length test (see Section 3.5 UV Monitor,
on page 38).
6
ÄKTA start Maintenance Manual 29060308 AD 123
5 Removing and replacing modules
5.4 UV flow cell