EasyManua.ls Logo

GE akta start - Sine Generator Calibration

GE akta start
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.11.2 Sine generator calibration
Instructions
Follow the instructions below to calibrate the sine generator. This must be done when-
ever the Main Board is replaced.
The Main Board may only be replaced by a GE service engineer.
Note:
ActionStep
Use Manual Run to empty any liquid present in the conductivity flow path.1
Remove the end connectors on the conductivity flow cell and blow oil-free
air through the cell to remove the last traces of liquid.
Navigate to screen 3 in Settings and service. Tap Conductivity.2
Result: The Conductivity screen opens.
Result: The Advanced calibration screen opens.
Tap Calibrate sine gen.3
Result: The sine generator is calibrated and the Cell resistance value is dis-
played on the screen.
Check that the Cell resistance value is 60 000 000 ohms.4
If a different value is displayed, clean the conductivity flow cell and recali-
brate. If the value is stoöö incorrect after repeated attempts, contact GE
service.
70 ÄKTA start Maintenance Manual 29060308 AD
3 Maintenance operations
3.11 Conductivity Monitor
3.11.2 Sine generator calibration

Other manuals for GE akta start

Related product manuals