EasyManuals Logo

GE akta start Maintenance Manual

GE akta start
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
3.5.3 Flow cell path length
Description
A Flow cell path length test is used to derive the actual path length of the UV flow cell.
The test should be performed when the UV Monitor or the UV flow cell has been replaced,
and when normalized UV absorption comparisons between different systems are
needed.
Parameter description
DescriptionParameter
Path length of the UV flow cell (mm).Cell
The absorbance of the liquid in the UV flow cell (mAU).Abs
UV LED drift compensation constant.C drft
Ambient temperature compensation constant.C amb
NOTICE
Do not change the C drft and C amb values. These parameters
must be set by a GE Service Engineer.
Prerequisites
Buffer A: immerse Buffer A inlet into demineralized water.
Buffer B: freshly prepared 1.0% acetone solution (vol/vol), which is expected to give
an absorbance value of 340 mAU.
44 ÄKTA start Maintenance Manual 29060308 AD
3 Maintenance operations
3.5 UV Monitor
3.5.3 Flow cell path length

Other manuals for GE akta start

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE akta start and is the answer not in the manual?

GE akta start Specifications

General IconGeneral
BrandGE
Modelakta start
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals