EasyManua.ls Logo

GE akta start - Page 45

GE akta start
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instructions
Follow the instructions below to perform a Flow cell path length test and set a new cell
length.
ActionStep
Flush the UV flow cell with demineralized water using the Pump, and then
leave the UV flow cell filled with water.
1
Tap Flow cell path length.2
Result: The following screen opens.
Set the Cell value to 2.00 mm by using the up/down arrows or enter the
value in the text box.
3
Flush the UV flow cell thoroughly and leave it filled with demineralized water.4
Tap Set baseline to capture a new reference value for the test.
Result: Abs should show a value close to 0 mAU.
Flush the UV flow cell with 1.0% acetone solution, and then leave it filled.5
Note the new Abs value.
Calculate the actual Flow cell path length by using the following formula:6
Cell (mm) = 2.00 * (new Abs value / 340 )
ÄKTA start Maintenance Manual 29060308 AD 45
3 Maintenance operations
3.5 UV Monitor
3.5.3 Flow cell path length

Other manuals for GE akta start

Related product manuals