ActionStep
Place the new tubing between the rollers and the track, press against the
pump head inner wall.
4
Note:
Make sure that the pump tubing is not twisted or stretched against the rollers.
Lower the top cover until it clicks into its fully closed position.5
The track closes automatically and the tubing is stretched correctly as the
track closes.
130 ÄKTA start Maintenance Manual 29060308 AD
5 Removing and replacing modules
5.6 Pump tubing