EasyManua.ls Logo

GE akta start - Page 51

GE akta start
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Use the up/down arrows to set the desired Flow Rate.3
Tap Start flow to start the Pump.
Collect water for at least one minute in the pre-weighed collection tube.
Tap Stop flow to turn the Pump OFF.
Weigh the pre-weighed collection tube containing the collected water
and calculate the volume of the pumped water, then set the Collected
Volume value equal to this volume.
4
Tap Calibrate.5
Result: The following screen opens.
Wait while the calibration is running. The calibration is done when the Cali-
bration screen re-opens.
6
ÄKTA start Maintenance Manual 29060308 AD 51
3 Maintenance operations
3.6 Pump
3.6.1 Calibration

Other manuals for GE akta start

Related product manuals