EasyManua.ls Logo

GE akta start - Page 76

GE akta start
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Settings and service screen, tap Pressure sensor.2
Result: The Pressure sensor screen opens.
Note:
Stop flow and Calibrate are for use by GE service engineers only.
In the Pressure sensor screen, tap Zero offset.3
Result: A Message screen opens.
Make sure that there is no back pressure in the system, and then tap OK.
76 ÄKTA start Maintenance Manual 29060308 AD
3 Maintenance operations
3.12 Pressure sensor

Other manuals for GE akta start

Related product manuals