EasyManua.ls Logo

GE akta start - Page 91

GE akta start
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Tap the radio button to select the required timing:3
Switch valve timing A (switch time 4 s)
Switch valve timing B (switch time 5 s)
Tap Save to save the timing.
Perform Gradient run, either by performing System performance method
or manually set the B concentration (Buffer valve) to 50%. Examine the
gradient for fluctuations.
4
If wavy gradients still are obtained, or if fluctuations on step gradient levels
are large, then select Advanced timing.
5
Result: The following screen opens.
Set switch valve time in the range of 3.0 to 5.0 s (0.1 s increments) by pressing
the up/down arrows.
Tap Save to save the optimized timing.6
ÄKTA start Maintenance Manual 29060308 AD 91
3 Maintenance operations
3.14 System
3.14.4 Switch valve timing

Other manuals for GE akta start

Related product manuals