ActionStep
Connect a piece of tubing from the bottom of the Superloop to:3
•
port LoopF on the Injection valve
or
•
the F port corresponding to the connected E port, eg., 1F, on the Loop valve
Fill the Superloop using a syringe
Follow the instruction below to fill the Superloop using a syringe.
ActionStep
Check if the system is in state Ready.1
•
If yes: The Injection valve is in position Manual Load per default. Continue to step 3.
•
If no: Continue to step 2 to position the valve.
In the Process Picture:2
•
Click the Injection valve and select Manual Load.
Result: The Injection valve switches to Manual Load position.
184 ÄKTA pure User Manual 29119969 AB
5 Operation
5.7 Sample application
5.7.2 Sample application using a Superloop
™