EasyManua.ls Logo

GE AKTApure - Page 191

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Process Picture:4
Click on the Injection valve and select Manual load.
Result: Injection valve is set to manual load.
If the loop is connected to:5
the Injection valve, continue to step 7.
the Loop valve, continue to step 6.
In the Process Picture:6
Click the Loop valve.
Select the position the loop is connected to, for example Position 1.
Result: The Loop valve switches to the selected position.
ÄKTA pure User Manual 29119969 AB 191
5 Operation
5.7 Sample application
5.7.3 Sample application using a sample loop

Table of Contents

Related product manuals