EasyManua.ls Logo

GE AKTApure - Page 343

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
For a system pump, in the Manual instructions dialog:
-
Select Flow path:Column valve, and select the position of the tubing connected
to the Column valve, in this example Position 1. Click Insert.
-
Select Flow path:Inlet A (for System pump A) or Flow path:Inlet B (for System pump
B) and select a Position, in this example A1 or B1. Click Insert.
-
Select Pumps:Gradient and set Target to 0% B (for System pump A) or 100% B
(for System pump B).
-
For pump P9: Select Pumps:System flow and set the Flow rate to 5.0 ml/min. Click
Insert.
-
For pump P9H: Select Pumps:System flow and set the Flow rate to 25.0 ml/min.
Click Insert.
-
Click Execute.
Result: A system flow starts.
For a sample pump, in the Manual instructions dialog:
-
Select Flow path:Column valve, and select the position of the tubing connected
to the Column valve, in this example Position 1. Click Insert.
-
Select Flow path:Sample inlet and select a Position, in this example S1. Click Insert.
-
Select Flow path:Injection valve and select Direct inject from the Position drop-
down list. Click Insert.
-
Select Pumps and Pressures:Sample flow and set the Flow rate to 25.0 ml/min.
Click Insert.
-
Click Execute.
Result: A sample flow starts.
4
Run the flow for 2 hours.5
Discard the used buffer.6
ÄKTA pure User Manual 29119969 AB 343
7 Maintenance
7.8 Replacement procedures
7.8.10 Replace pump piston seals of Pump P9 or P9H

Table of Contents

Related product manuals