EasyManua.ls Logo

GE AKTApure - Page 446

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Included phasesPrinciplePredefined maintenance
method
The system is filled with cleaning solution. Select
for example inlets, outlets and column positions
to be cleaned. Three System CIP phases are in-
cluded in the method to facilitate the use of
three different cleaning solution. Additional
System CIP phases can be added from the
Phase Library if desired.
System CIP
The system is filled with preparation solution.
Select for example inlets, outlets and column
positions to be prepared. Two System Prepara-
tion phases are included in the method. Addition-
al System Preparation phases can be added
from the Phase Library if desired.
System Preparation
446 ÄKTA pure User Manual 29119969 AB
9 Reference information
9.7 Predefined methods and phases
9.7.2 Predefined maintenance methods

Table of Contents

Related product manuals