DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 65
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables removed earlier
2.) Power up the system to verify that it operates as intended.
3.) Monitor Arm and Main Monitor movement functions in all directions without the covers loosening.
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Table 8-73 Main Monitor Arm Assembly Covers replacement Functional Checks
See:
Section Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Equipment passed all
required checks and is ready for use.
4-2-7 B-Mode Checks
4-2-4 Power SHUT DOWN