DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 79
8-6-18 Bulkhead Cover replacement
Table 8-94 Manpower / Time and Tools
Manpower /
Time Total
Tools / PPE
One person /
15 minutes
No tools are required.
Table 8-95 Preparations and Preparation Link
Preparations - you must perform the following steps
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
Preparation Link (if you need more information):
4-2-4 "Power SHUT DOWN" on page 4-9.