DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 95
3.
Remove the Rotation Limit Set Screw from
the Arm Assembly using a 5 mm hex
wrench.
4.
Take the Monitor Arm and Cables and feed
the Power Cable into the Adapter first.
Position the Video Cable Connector as
shown and continue to feed the cables into
the Adapter.
Install the Arm Assembly.
Route the Cables into the Adapter one at a
time.
Table 8-108 Monitor Arm assembly installation
Steps Corresponding Graphic