EasyManuals Logo

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #376 background imageLoading...
Page #376 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 130 Section 8-7 - Replacing Top Console Parts
Bulkhead Board installation
Table 8-148 Bulkhead Board installation
Steps Corresponding Graphic
1. Re-install the Bulkhead Board by sliding it
under the two tabs.
Re-install the two grounding screws and
washers. Torque 1.3 Nm (1.2 lbf-ft).
2. Reconnect the cables to the Bulkhead Board:
• Power P4 - slide locking latch to secure,
• USB P8,
• Speakers P5 (right) and P6 (left),
• Video (HDMI) P10 - re-install 5 mm screw (from back of Bulkhead Plate) to secure cable
retainer. Torque 1.3 Nm (1.2 lbf-ft).
(space intentionally left blank)

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
TouchscreenYes
3D/4D ImagingYes
ApplicationsVascular, Cardiac, Musculoskeletal, OB/GYN
Image StorageUSB, Network
ConnectivityDICOM, Ethernet, Wireless

Related product manuals