DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 130 Section 8-7 - Replacing Top Console Parts
Bulkhead Board installation
Table 8-148 Bulkhead Board installation
Steps Corresponding Graphic
1. Re-install the Bulkhead Board by sliding it
under the two tabs.
Re-install the two grounding screws and
washers. Torque 1.3 Nm (1.2 lbf-ft).
2. Reconnect the cables to the Bulkhead Board:
• Power P4 - slide locking latch to secure,
• USB P8,
• Speakers P5 (right) and P6 (left),
• Video (HDMI) P10 - re-install 5 mm screw (from back of Bulkhead Plate) to secure cable
retainer. Torque 1.3 Nm (1.2 lbf-ft).
(space intentionally left blank)