DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 151
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) Connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Select comments and type different A/N keys to confirm keyboard functionality.
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
2. Re-install the elastomer. MAKE SURE the elastomer is completely seated on the board.
3. Replace Encoder(s)/Joystick(s) as necessary. Secure the Encoder(s)/Joystick(s).
4. Re-assemble Lower Op, re-install Lower Op, Upper Op and all Covers removed.
Table 8-174 Lower Op Encoders and Encoders/Joysticks replacement Functional
Checks
See:
Section Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Equipment passed all
required checks and is ready for use.
4-2-7 B-Mode Checks
4-2-7 Probe/Connectors Checks
4-2-7 System CFM and PWD Checks
4-2-7 Basic Measurements
4-2-4 Power SHUT DOWN
Table 8-173 Lower Op Encoders and Encoders/Joysticks replacement
Steps Corresponding Graphic