EasyManuals Logo

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #529 background imageLoading...
Page #529 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 283
3.
Re-install the rear, GPU upper retainer T10
mounting screw.
4.
Locate the two T10, GPU lower retainer
mounting holes (circled).
5.
Assemble the GPU lower retainer, as
removed and re-install the two T10 screws.
Hand tighten.
Apply slight, even pressure on to the lower
retainer halves and tighten the screws
evenly.
Table 8-309 GPU installation
Steps Corresponding Graphic

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
TouchscreenYes
3D/4D ImagingYes
ApplicationsVascular, Cardiac, Musculoskeletal, OB/GYN
Image StorageUSB, Network
ConnectivityDICOM, Ethernet, Wireless

Related product manuals