EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 107

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Fit the tray on to the rocker platform. The attachment pins on the tray engage
with the holes in the platform. Attach the pins on the upper edge first, then
slide the tray down making sure that the lower pins engage with the respec-
tive holes.
Note:
Make sure that the holes for the temperature sensors on the rocker platform
fit into the holes in the tray.
3
Make sure that the connector on the tray is plugged into the tray connector
on the back of the rocker platform.
4
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 107
5 Operation
5.1 Set up the system
5.1.2 Attach and detach tray

Table of Contents

Related product manuals