EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 118

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Lower the flip top until it clicks into its fully closed position.5
Connect inlet and outlet tubing to the Cellbag bioreactor, for example acid,
base, feed and harvest.
6
The pumping direction is indicated by the arrow on the pump head.
Note:
118 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump

Table of Contents

Related product manuals