ActionStep
Lower the flip top until it clicks into its fully closed position.5
Connect inlet and outlet tubing to the Cellbag bioreactor, for example acid,
base, feed and harvest.
6
The pumping direction is indicated by the arrow on the pump head.
Note:
118 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals