EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 117

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Open the flip top of the pump head completely.2
Check that the tubing holder is adjusted to the correct position for your size
of tubing. See instructions above.
3
Place the tubing between the rotor rollers and the track, pressed against
the inner wall of the pump head.
4
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 117
5 Operation
5.1 Set up the system
5.1.5 Prepare the pump

Table of Contents

Related product manuals