EasyManua.ls Logo

GE ReadyToProcess WAVE 25 - Page 120

GE ReadyToProcess WAVE 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Set up aeration and gas supply
Follow the instructions below to connect gas to the bioreactor system.
ActionStep
Attach the filter heater to the outlet vent filter of the Cellbag bioreactor. In
dual mode, make sure that the filter heaters are correctly placed with respect
to the left and right bioreactors.
Note:
The inlet and outlet vent filters are distinguished by the pressure control valve
on the outlet filter (indicated by an arrow in the illustration below). Do not at-
tach the filter heater to the inlet vent filter.
1
The image below shows the filter heater mounted on the stand on the Cellbag
bioreactor.
120 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.1 Set up the system
5.1.6 Connect gas to the system

Table of Contents

Related product manuals