EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #121 background imageLoading...
Page #121 background image
ActionStep
Connect tubing from the GAS MIX OUT on the CBCU front panel to the inlet
vent filter of the Cellbag bioreactor.
2
Connect the desired gas source, air or N
2
, at 1.0 to 1.5 bar to AIR/N2 on the
CBCU rear panel.
3
If applicable, connect the CO
2
gas source at 1.0 to 1.5 bar to CO2 IN on the
CBCU rear panel.
4
If applicable, connect the O
2
gas source at at 1.0 to 1.5 bar to O2 IN on the
CBCU rear panel.
5
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 121
5 Operation
5.1 Set up the system
5.1.6 Connect gas to the system

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals