EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #140 background imageLoading...
Page #140 background image
ActionStep
Set the desired rocking speed and angle in Settings:Rocking in the Process
Picture. Start the rocking by clicking the right-hand side of the Rocking
button.
1
Note:
When using Tray 50, the value of rocking speed multiplied by rocking angle
may not exceed 240 (e.g., with a rocking angle of 12° the rocking speed is
limited to 20 rpm).
Set the desired gas flow in Settings:Gas control:Gas flow in the Process
Picture. Start the gas flow by clicking the right-hand side of the Gas flow
button.
2
If applicable, turn on CO
2
mixing by clicking the right-hand side of the CO2
button in the Process Picture.
3
Set the required temperature setpoint.4
Click the right-hand side of the Temp button to start heating.5
Equilibrate the medium for at least 2 hours.6
140 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
5 Operation
5.3 Prepare for cultivation
5.3.3 Add and equilibrate culture medium

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals