CAUTION
Leakage risk of biological substances. Before every use, check
the integrity of all tubing and connections.
CAUTION
Leakage risk of biological substances. Always enter the correct
Cellbag bioreactor size in the system software settings. Failure to
do this may cause overpressure and subsequent rupture of the
Cellbag bioreactor.
CAUTION
Pinch hazard. Body parts may be caught between the rocker base
and tray.
CAUTION
Pinch hazard. Be careful not to trap any fingers between the
rocker platform and tray when repositioning Tray 10 from tilt posi-
tion. Move the tray by firmly gripping both sides of the tray.
CAUTION
Pinch hazard. Moving parts in [[ProductName7]]. Do not open any
pump head flip tops during operation.
CAUTION
Falling equipment. To prevent the bioreactor system units from
accidentally being pulled from the bench, make sure that all tubing
is kept inside the bench area.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 23
2 Safety instructions
2.1 Safety precautions

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals