EasyManuals Logo

GE ReadyToProcess WAVE 25 User Manual

GE ReadyToProcess WAVE 25
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #53 background imageLoading...
Page #53 background image
DescriptionComponentPart
Connector for pH sensor fiber cable.pH port1
Gas outlet for connection to Cellbag bioreactor.GAS MIX OUT2
Indicates the CBCU operating status.Status LED3
Connector for DO sensor fiber cable.DO port4
Status LED
The status LED indicates the CBCU operating status according to the following table.
DescriptionLight indicator
The CBCU is ready for operation.Steady green light
The CBCU is operating.Green flashing light
Indicates an internal error, but the CBCU is still operating.Red flashing light
Indicates an internal error, and the CBCU is not operating.Steady red light
Rear view of ReadyToProcess
CBCU
The illustration below shows the rear panel of a fully configured CBCU.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 53
3 System description
3.3 ReadyToProcess CBCU

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals