Illustration of system setup,
single mode
The illustration below shows the recommended setup of the bioreactor system on the
laboratory bench for operation in single mode.
Illustration of system setup, dual
mode
In dual mode, place the ReadyToProcess CBCU and ReadyToProcess Pump 25 units on
either side of the rocker to correspond with the L and R designations in the software.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 77
4 Installation
4.1 Site preparation
4.1.2 Site requirements