ActionStep
Cut the Tygon tubing into pieces of appropriate length, one piece for con-
necting gas distribution from the CBCU to the Cellbag bioreactor and as
many pieces as required for connecting the gas mix sources to the CBCU.
1
Insert a CPC™ tubing connector into one end of each piece.2
For the tubing used to connect the CBCU to the Cellbag bioreactor, connect
the end without the CPC connector to the silicone tubing using the supplied
reducer connector.
3
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 89
4 Installation
4.2 Hardware installation
4.2.2 Connect the system components

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE ReadyToProcess WAVE 25 and is the answer not in the manual?

GE ReadyToProcess WAVE 25 Specifications

General IconGeneral
BrandGE
ModelReadyToProcess WAVE 25
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals