EasyManua.ls Logo

HDG Pelletmaster 15 - Page 75

Default Icon
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Planning and installation – Delivery and vacuum delivery system
75
INSTALLING THE BEARING UNIT
7. Remove the first nut from the bearing unit (3).
8. The second nut (2) must be about 1.5 cm from the start of the
thread (1).
9. Slide the flush side (4) of the bearing unit towards the auger
lining onto the turned shaft end.
The bearing unit has been installed on the delivery auger.
I
NSTALLING THE PRESSURE
RELIEF PLATE
10.Position the pressure relief plate (2) over the delivery auger (3).
11.The hole (5) for the bearing unit must be at the end of the delivery
auger (3).
12.Ensure that the pressure relief plate (2) is flush with the transfer
station (1).
13.Screw the pressure relief plate (2) to the sloping floor (4) using the
chipboard screws.
The pressure relief plate has been installed.
Figure 4/67 - Installing the bearing unit
2
1
3
4
Figure 4/68 - Installing the pressure relief plate
5
1
2
3
4

Table of Contents