EasyManua.ls Logo

HPE ProLiant ML110 Gen10

HPE ProLiant ML110 Gen10
141 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Removing and replacing the M.2 SSD enablement board
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all PCI slots have
either an expansion slot cover or an expansion board installed.
CAUTION: Before replacing a DIMM, expansion board, or other similar PCA components due to a perceived
hardware error, make sure first that the component is firmly seated in the slot. Do not bend or flex circuit boards
when reseating components.
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1.
Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Server in rack mode:
Remove the server from the rack.
Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the PCI air bale.
7.
Remove the system air bale.
8.
Disconnect the M.2 SATA cables from the enablement board.
9.
Remove the M.2 SSD enablement board.
Removal and replacement procedures
57

Table of Contents

Other manuals for HPE ProLiant ML110 Gen10

Related product manuals