NO TICE
A leakage protection device must be congured for the AC output of the
iSitePower-M. The leakage current must be 30 mA. You need to congure and
install the device by yourself.
NO TE
In single-system scenarios, connect the other end of the cable to the AC load. In parallel-
system scenarios, connect the other end of the cable to the parallel box.
Procedure
Step 1 Connect an AC power cable to the terminal connector.
Figure 10-13 Connecting the cable to the terminal connector
Step 2 Install the AC output power cable and secure the cable using cable clips.
Figure 10-14 Installing the AC output power cable
----End
iSitePower-M (MAP05A1, MAB05B1)
User Manual 10 Electrical Connections
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 110