Figure 10-47 Installing genset control signal cables
----End
10.5.6 Installing the Grid Detection Cable of the ATS
NO TICE
In the genset-grid scenario, the automatic transfer switch (ATS) must support the
grid detection function. Connect the grid detection cable of the ATS to the dry
contact port DIN1/port DIN2.
Procedure
Step 1 Install the grid detection cable of the ATS.
Figure 10-48 Install the grid detection cable of the ATS
----End
iSitePower-M (MAP05A1, MAB05B1)
User Manual 10 Electrical Connections