Figure 10-69 Installing battery signal cables
When a communications terminal is connected to a single network cable, the
waterproof rubber plug must be installed for the hole with no cable routed.
Otherwise, the waterproof performance may be
aected and the device will be
damaged.
----End
10.9 (Optional) Connecting a Remote EPO Cable
● The EPO switch can be connected to the device and can be associated with
DIN1/DIN2 through software conguration. By default, the EPO switch is
closed.
● Press and hold the EPO switch for 3s to shut down the entire system (including
the genset).
● The connection position of the EPO switch must be
dierent from the mains
detection position of the ATS.
● Prepare the EPO switch and cable before installation. The recommended cable
size is 22 AWG.
● Equip the EPO switch with a protective cover to prevent misoperations, and
protect the cable with a protective tube.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 10 Electrical Connections
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 158