Huawei iSitePower-M MAP05A1 - Determining the Installation Position

Huawei iSitePower-M MAP05A1
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Type Tools and Instruments
Dust mask Protective shoes
-
7.1.3 Determining the Installation Position
Installation Angle Requirement
The battery can be oor-mounted and wall-mounted. The installation angle
requirement is as follows:
Do not install the battery at forward tilted, back tilted, side tilted, horizontal,
or upside down positions.
Installation Position Requirements
Install the battery on a solid brick-concrete structure or concrete wall or
oor.
If other types of walls and oors are used, they must be made of re-
retardant materials and meet the load-bearing requirements of the
equipment.
The bearing capacity of the ground must be greater than or equal to 500
kg/m
2
.
Installation Space Requirements
During installation, ensure that there is no other devices (except related
Huawei devices and awnings) or
ammable or explosive materials around the
batteries. Reserve adequate space for heat dissipation and safety isolation.
When the battery is mounted on a wall, do not place any objects under the
battery.
Installation Dimensions
Reserve
sucient clearance around the product for installation and heat
dissipation.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 7 System Installation
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 73