● When installing the 4G wireless backhaul module, ensure that the clip is in place.
● Ensure that the protective cover is properly installed.
----End
7.6 (Optional) Installing an AC Parallel Box
Prerequisites
In a parallel system, an AC parallel box must be congured.
Step 1 Mark mounting holes.
Figure 7-18 Marking mounting holes
Step 2 Install expansion bolts.
iSitePower-M (MAP05A1, MAB05B1)
User Manual 7 System Installation
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 83